Bitcoin Forum
January 03, 2026, 07:27:02 AM *
News: Latest Bitcoin Core release: 30.0 [Torrent]
 
   Home   Help Search Login Register More  
Warning: One or more asktom.cf users have reported that they strongly believe that the creator of this topic is a scammer. (Login to see the detailed trust ratings.) While the asktom.cf administration does not verify such claims, you should proceed with extreme caution.
Pages: « 1 ... 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 [1084] 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 ... 2136 »
  Print  
Author Topic: Swedish ASIC miner company kncminer.com  (Read 3050099 times)
Bitcoinorama
Hero Member
*****
Offline Offline

Activity: 532
Merit: 500



View Profile
November 15, 2013, 01:27:07 PM
 #21661


New PCB design was finalised last week, they are being made, they will be sent direct to the manufacturing facility, where the units will be assembled, tested and sent direct by courier. So production has started, but based on what i've seen from before, personally if I was a betting man I'd be looking at deliveries in the last week of Nov. I'm not personally being tied to dates, i'd just rather play devils advocate. This will move a lot quicker this time. The manufacturing run has been optimised and the staff have now all had experience in assembling these units. Marcus will be on site the entire time they are being made, I won't as i'll be heading to the London Bitcoin expo on the 30th, my homeground. Wink

That said, from what i've seen you're going to love what's been done to these new revisions. These make use of those 320w heatsinks a little more, so none of you will be going cold this winter that's for sure!!

Thinking about going down to the expo as well, I will let you know. Are you bringing over any equipment to show?

O'rama can i be an annoying bugger and ask about the reseller stuff again? Have the production facility been notified about the units people have earned via reselling, or will it be done manually by customer service? Sorry to ask!

If you have resold, then your unit gets shipped after the last unit that reached 10 resells has been passed.

Yeah I'll more than likely have a November unit to show. It'd be pointless attending otherwise!!

Make my day! Say thanks if you found me helpful Smiley BTC Address --->
1487ThaKjezGA6SiE8fvGcxbgJJu6XWtZp
lemonte
Hero Member
*****
Offline Offline

Activity: 624
Merit: 502


View Profile
November 15, 2013, 01:33:02 PM
 #21662


New PCB design was finalised last week, they are being made, they will be sent direct to the manufacturing facility, where the units will be assembled, tested and sent direct by courier. So production has started, but based on what i've seen from before, personally if I was a betting man I'd be looking at deliveries in the last week of Nov. I'm not personally being tied to dates, i'd just rather play devils advocate. This will move a lot quicker this time. The manufacturing run has been optimised and the staff have now all had experience in assembling these units. Marcus will be on site the entire time they are being made, I won't as i'll be heading to the London Bitcoin expo on the 30th, my homeground. Wink

That said, from what i've seen you're going to love what's been done to these new revisions. These make use of those 320w heatsinks a little more, so none of you will be going cold this winter that's for sure!!

Thinking about going down to the expo as well, I will let you know. Are you bringing over any equipment to show?

O'rama can i be an annoying bugger and ask about the reseller stuff again? Have the production facility been notified about the units people have earned via reselling, or will it be done manually by customer service? Sorry to ask!

If you have resold, then your unit gets shipped after the last unit that reached 10 resells has been passed.

Yeah I'll more than likely have a November unit to show. It'd be pointless attending otherwise!!

Thanks for letting me know, will that happen automatically? Sorry, I sound like an excited child just before Christmas, which is not too far from the truth really!

I'll drop you a PM closer to the time, would be nice to have a pint and a chat Smiley Thanks for the updates.

CYPER
Hero Member
*****
Offline Offline

Activity: 812
Merit: 502



View Profile
November 15, 2013, 01:37:09 PM
 #21663

Let's see if I can make these work  Cheesy

joeventura
Hero Member
*****
Offline Offline

Activity: 854
Merit: 500



View Profile
November 15, 2013, 01:40:12 PM
 #21664


Guys, due to the fact we underestimated the demand and oversold, we had to wait for the rest to be produced at the factory. Currently as you can see, they are being packed with all the auxiliary parts, then labelled.

As they sold out and were paid for in seconds, and there isn't any logical order of sale, we sat down and had a chat as how to best approach this, and to be fair to everybody that ordered within those 7 minutes, they are all being shipped at the same time on Monday.



You underestimated that 200 upgrade modules would sell in the same day? Really?

I'd always prefer that you not say you will ship THIS week if you aren't going to ship until NEXT week.

Pay on the 12th, Ship on the 18th, Arrive on the 23rd if LUCKY

Time is money
jelin1984
Legendary
*
Offline Offline

Activity: 2408
Merit: 1004



View Profile
November 15, 2013, 01:40:40 PM
 #21665

How you connect the extra ports to the knc board?
vesperwillow
Hero Member
*****
Offline Offline

Activity: 616
Merit: 500


View Profile
November 15, 2013, 01:48:12 PM
 #21666

again, when i bought a mercury i knew it was going to be upgradable, but not a one time fire sale that lasted 3 minutes and couldn't even pay properly. not cool.

^-- Agree with the spirit of that.

Orama, do you guys have any comment as to why the business model is to still take 100% payment for things which are in the distance for shipping? Why not a 25/75, 60/40, etc? I could understand a few days for handling time, but when you're talking weeks or a month, there's capital gains involved.

davewr2013
Full Member
***
Offline Offline

Activity: 238
Merit: 100

Bitcoin For All


View Profile
November 15, 2013, 02:00:27 PM
 #21667


Guys, due to the fact we underestimated the demand and oversold, we had to wait for the rest to be produced at the factory. Currently as you can see, they are being packed with all the auxiliary parts, then labelled.

As they sold out and were paid for in seconds, and there isn't any logical order of sale, we sat down and had a chat as how to best approach this, and to be fair to everybody that ordered within those 7 minutes, they are all being shipped at the same time on Monday.


This is rather disappointing as I would have thought that these would be shipped out based on the order number, considering that these were all paid with BTC (no wire transfer delays). It looks like I would be receiving the coolers before the modules

Hopefully the Monday shipments are on time

Cheers

If they really want to be "fair" then why not first ship the units going outside the EU? I know that getting here to Canada took about 7-8 days -- although one day was a screw-up on our part -- I think.

Just sayin'  Grin

Cheers!

Give me this day my daily Bitcoin...
edgar
Legendary
*
Offline Offline

Activity: 1859
Merit: 1001


View Profile
November 15, 2013, 02:12:35 PM
 #21668

@ anyone w/jupiter - what are you using for the 4th module with your V850s?

mine came with 3 'twin' connectors, so im using one connector 'twice' and it is HOT!



Twin molex to PCI-E is one solution.
Or I read that you can use one of the CPU slots to plug an additional PCI-E cable there (if you have any), but do your own research for that as I cannot be held responsible for any damages.

Btw if you send an email to Cooler Master to request additional PCI-E cables they will be happy to send you some. I'm currently waiting 7 to arrive:



Bless you, I'll email them immediately.

i saw the 2 molex - pci-e option in 2011 but not comfortable trying it on the jupiter

was curious what others are using - the twin method works but less than ideal, especially with an empty pci-e slot right thurr

what are you using to power ur extras, a second psu?
Bitcoinorama
Hero Member
*****
Offline Offline

Activity: 532
Merit: 500



View Profile
November 15, 2013, 02:16:51 PM
 #21669


New PCB design was finalised last week, they are being made, they will be sent direct to the manufacturing facility, where the units will be assembled, tested and sent direct by courier. So production has started, but based on what i've seen from before, personally if I was a betting man I'd be looking at deliveries in the last week of Nov. I'm not personally being tied to dates, i'd just rather play devils advocate. This will move a lot quicker this time. The manufacturing run has been optimised and the staff have now all had experience in assembling these units. Marcus will be on site the entire time they are being made, I won't as i'll be heading to the London Bitcoin expo on the 30th, my homeground. Wink

That said, from what i've seen you're going to love what's been done to these new revisions. These make use of those 320w heatsinks a little more, so none of you will be going cold this winter that's for sure!!

Thinking about going down to the expo as well, I will let you know. Are you bringing over any equipment to show?

O'rama can i be an annoying bugger and ask about the reseller stuff again? Have the production facility been notified about the units people have earned via reselling, or will it be done manually by customer service? Sorry to ask!

If you have resold, then your unit gets shipped after the last unit that reached 10 resells has been passed.

Yeah I'll more than likely have a November unit to show. It'd be pointless attending otherwise!!

Thanks for letting me know, will that happen automatically? Sorry, I sound like an excited child just before Christmas, which is not too far from the truth really!

I'll drop you a PM closer to the time, would be nice to have a pint and a chat Smiley Thanks for the updates.

No worries bro, look forward to it. It's a free event btw...

Make my day! Say thanks if you found me helpful Smiley BTC Address --->
1487ThaKjezGA6SiE8fvGcxbgJJu6XWtZp
Bitcoinorama
Hero Member
*****
Offline Offline

Activity: 532
Merit: 500



View Profile
November 15, 2013, 02:18:48 PM
 #21670


Guys, due to the fact we underestimated the demand and oversold, we had to wait for the rest to be produced at the factory. Currently as you can see, they are being packed with all the auxiliary parts, then labelled.

As they sold out and were paid for in seconds, and there isn't any logical order of sale, we sat down and had a chat as how to best approach this, and to be fair to everybody that ordered within those 7 minutes, they are all being shipped at the same time on Monday.


This is rather disappointing as I would have thought that these would be shipped out based on the order number, considering that these were all paid with BTC (no wire transfer delays). It looks like I would be receiving the coolers before the modules

Hopefully the Monday shipments are on time

Cheers

If they really want to be "fair" then why not first ship the units going outside the EU? I know that getting here to Canada took about 7-8 days -- although one day was a screw-up on our part -- I think.

Just sayin'  Grin

Cheers!


That's out of our control, but the fact local Swedes and Europeans may indeed receive modules even earlier if we shipped based on order number a daily amount is a large part of the reasoning to hold them back and ship all on the same day.

Make my day! Say thanks if you found me helpful Smiley BTC Address --->
1487ThaKjezGA6SiE8fvGcxbgJJu6XWtZp
Bitcoinorama
Hero Member
*****
Offline Offline

Activity: 532
Merit: 500



View Profile
November 15, 2013, 02:19:40 PM
 #21671

again, when i bought a mercury i knew it was going to be upgradable, but not a one time fire sale that lasted 3 minutes and couldn't even pay properly. not cool.

^-- Agree with the spirit of that.

Orama, do you guys have any comment as to why the business model is to still take 100% payment for things which are in the distance for shipping? Why not a 25/75, 60/40, etc? I could understand a few days for handling time, but when you're talking weeks or a month, there's capital gains involved.

I don't follow sorry, please elaborate on what you mean.

Make my day! Say thanks if you found me helpful Smiley BTC Address --->
1487ThaKjezGA6SiE8fvGcxbgJJu6XWtZp
bobsag3
Hero Member
*****
Offline Offline

Activity: 546
Merit: 500

Owner, Minersource.net


View Profile
November 15, 2013, 02:23:23 PM
 #21672

@ anyone w/jupiter - what are you using for the 4th module with your V850s?

mine came with 3 'twin' connectors, so im using one connector 'twice' and it is HOT!



Twin molex to PCI-E is one solution.
Or I read that you can use one of the CPU slots to plug an additional PCI-E cable there (if you have any), but do your own research for that as I cannot be held responsible for any damages.

Btw if you send an email to Cooler Master to request additional PCI-E cables they will be happy to send you some. I'm currently waiting 7 to arrive:



Bless you, I'll email them immediately.

i saw the 2 molex - pci-e option in 2011 but not comfortable trying it on the jupiter

was curious what others are using - the twin method works but less than ideal, especially with an empty pci-e slot right thurr

what are you using to power ur extras, a second psu?

I would not use PCI-E to molex adaptors for a jupiter. those were designed with the 75W PCI-E limit in mind, and a single jupiter ASIC draws far more than 75w
Paladin69
Hero Member
*****
Offline Offline

Activity: 784
Merit: 1000


View Profile
November 15, 2013, 02:32:39 PM
 #21673

again, when i bought a mercury i knew it was going to be upgradable, but not a one time fire sale that lasted 3 minutes and couldn't even pay properly. not cool.

^-- Agree with the spirit of that.

Orama, do you guys have any comment as to why the business model is to still take 100% payment for things which are in the distance for shipping? Why not a 25/75, 60/40, etc? I could understand a few days for handling time, but when you're talking weeks or a month, there's capital gains involved.

I don't follow sorry, please elaborate on what you mean.

Some up front, some before delivery.  A lot of people lost buying miners @ spot prices 3x lower.
ASIC-K
Sr. Member
****
Offline Offline

Activity: 280
Merit: 250


Hell?


View Profile
November 15, 2013, 02:33:02 PM
 #21674

again, when i bought a mercury i knew it was going to be upgradable, but not a one time fire sale that lasted 3 minutes and couldn't even pay properly. not cool.

^-- Agree with the spirit of that.

Orama, do you guys have any comment as to why the business model is to still take 100% payment for things which are in the distance for shipping? Why not a 25/75, 60/40, etc? I could understand a few days for handling time, but when you're talking weeks or a month, there's capital gains involved.

I don't follow sorry, please elaborate on what you mean.

Some up front, some before delivery.  A lot of people lost buying miners @ spot prices 3x lower.

+1
elasticband
Legendary
*
Offline Offline

Activity: 1036
Merit: 1000


Nighty Night Don't Let The Trolls Bite Nom Nom Nom


View Profile
November 15, 2013, 02:36:24 PM
 #21675

are the upgrade modules including fan, heatsink and cables? can anyone point me int he direction of links to everything needed
CYPER
Hero Member
*****
Offline Offline

Activity: 812
Merit: 502



View Profile
November 15, 2013, 02:37:49 PM
 #21676

@ anyone w/jupiter - what are you using for the 4th module with your V850s?

mine came with 3 'twin' connectors, so im using one connector 'twice' and it is HOT!



Twin molex to PCI-E is one solution.
Or I read that you can use one of the CPU slots to plug an additional PCI-E cable there (if you have any), but do your own research for that as I cannot be held responsible for any damages.

Btw if you send an email to Cooler Master to request additional PCI-E cables they will be happy to send you some. I'm currently waiting 7 to arrive:



Bless you, I'll email them immediately.

i saw the 2 molex - pci-e option in 2011 but not comfortable trying it on the jupiter

was curious what others are using - the twin method works but less than ideal, especially with an empty pci-e slot right thurr

what are you using to power ur extras, a second psu?

I would not use PCI-E to molex adaptors for a jupiter. those were designed with the 75W PCI-E limit in mind, and a single jupiter ASIC draws far more than 75w

Each 12V 18AWG cable is rated up to 11Amps, but let's be a little conservative and drop that down to 6Amps. So this Twin Molex to PCI-E has 2 of these = 12Amps, which is sufficient for a single module.
edgar
Legendary
*
Offline Offline

Activity: 1859
Merit: 1001


View Profile
November 15, 2013, 02:47:26 PM
 #21677

@ anyone w/jupiter - what are you using for the 4th module with your V850s?

mine came with 3 'twin' connectors, so im using one connector 'twice' and it is HOT!



Twin molex to PCI-E is one solution.
Or I read that you can use one of the CPU slots to plug an additional PCI-E cable there (if you have any), but do your own research for that as I cannot be held responsible for any damages.

Btw if you send an email to Cooler Master to request additional PCI-E cables they will be happy to send you some. I'm currently waiting 7 to arrive:



Bless you, I'll email them immediately.

i saw the 2 molex - pci-e option in 2011 but not comfortable trying it on the jupiter

was curious what others are using - the twin method works but less than ideal, especially with an empty pci-e slot right thurr

what are you using to power ur extras, a second psu?

I would not use PCI-E to molex adaptors for a jupiter. those were designed with the 75W PCI-E limit in mind, and a single jupiter ASIC draws far more than 75w

Each 12V 18AWG cable is rated up to 11Amps, but let's be a little conservative and drop that down to 6Amps. So this Twin Molex to PCI-E has 2 of these = 12Amps, which is sufficient for a single module.


still, its not happenin on my ONLY jupiter.

you with your 19 boards can give the double molex a spin..Wink
vesperwillow
Hero Member
*****
Offline Offline

Activity: 616
Merit: 500


View Profile
November 15, 2013, 02:58:17 PM
 #21678


still, its not happenin on my ONLY jupiter.

you with your 19 boards can give the double molex a spin..Wink

Current is current. You can use a cheap computer PSU and jump start a car battery with it. 6amp contuous load on 18ga is absolutely not an issue. He's using what's effecively a safety factor of 4 doing it the way he's doing it. I doubt he'll have issues.

Bitcoinorama
Hero Member
*****
Offline Offline

Activity: 532
Merit: 500



View Profile
November 15, 2013, 02:58:26 PM
 #21679

are the upgrade modules including fan, heatsink and cables? can anyone point me int he direction of links to everything needed

No heatsink, ergo, you need a heatsink.

Make my day! Say thanks if you found me helpful Smiley BTC Address --->
1487ThaKjezGA6SiE8fvGcxbgJJu6XWtZp
soy
Legendary
*
Offline Offline

Activity: 1428
Merit: 1013



View Profile
November 15, 2013, 02:59:45 PM
 #21680

https://www.kncminer.com/news/news-66

Today is the 15TH of November and we were due to start shipping, There is some bad news and some good news, The Bad news is the delivery of parts which we needed to begin today has been delayed by about 5-10 days
We found this out two days ago and have been working with the suppliers to get it as fast as possible but it’s not been possible I’m afraid,
 
But the good news is we can announce yet another performance improvement, All November batch boxes have a new PCB board and our engineers have been working overtime to improve the board as much as possible. We can now announce that the speed will be minimum of 650 GH/s in turbo mode or MORE depending on individual chip performance.  It’s important to note that the new turbo mode is not overclocking and will not void any warranty. But it’s also not available on the September/October Devices.
For the November shipments we are using UPS only and have increased the strength of the boxes to reduce the shipping issues.
We appreciate that any delay in shipment is not good news at all and we are doing EVERYTHING we can to decrease the delay.
Thanks
KnCMiner Team

Shipping delays applicable to miners, modules, both?
Pages: « 1 ... 1034 1035 1036 1037 1038 1039 1040 1041 1042 1043 1044 1045 1046 1047 1048 1049 1050 1051 1052 1053 1054 1055 1056 1057 1058 1059 1060 1061 1062 1063 1064 1065 1066 1067 1068 1069 1070 1071 1072 1073 1074 1075 1076 1077 1078 1079 1080 1081 1082 1083 [1084] 1085 1086 1087 1088 1089 1090 1091 1092 1093 1094 1095 1096 1097 1098 1099 1100 1101 1102 1103 1104 1105 1106 1107 1108 1109 1110 1111 1112 1113 1114 1115 1116 1117 1118 1119 1120 1121 1122 1123 1124 1125 1126 1127 1128 1129 1130 1131 1132 1133 1134 ... 2136 »
  Print  
 
Jump to:  

Powered by MySQL Powered by PHP Powered by SMF 1.1.19 | SMF © 2006-2009, Simple Machines Valid XHTML 1.0! Valid CSS!